Validation Tracking

Tracking validation status of LLM predictions and specifications against real data, experiments, and expert review. Claims are validated, refuted, or marked as needing further investigation based on evidence.

Validation Overview

11
Total Claims
75%
Avg Confidence
0
Validations (Last 30 Days)

By Status

Unvalidated
1
Validated
4
Partially Validated
3
Refuted
1
Outdated
2

By Source

Experiment 1
Simulation 4
Expert Review 3
Literature 3
Mission Data 2

Filters

Status Legend

Validated - Confirmed by evidence
Partially Validated - Some aspects confirmed
Refuted - Contradicted by evidence
Outdated - Needs re-validation
Unvalidated - Not yet tested
Showing 11 claims
Validated Phase 0

Hall thrusters can achieve 50,000+ hours of operational lifetime

60%

The panel finds AEPS has not flown and that required life is undemonstrated at relevant power in every propellant branch: the best Hall wear evidence is ~3,570 h at 12.5 kW Xe (HERMeS), the best throughput evidence ~918 kg at <=7 kW Xe (NEXT, gridded ion). The revised Phase 0 tugs need 1-2.5 MWe, rated TRL 2-4. The lifetime claim stands for the kW class; it does not transfer to MW-class clusters or to iodine and argon.

hall-thrusterlifetimepropulsionion-propulsion
5 validations - Updated Oct 20, 2026
Details
bom-0-5 rq-0-20
Outdated Phase 0

Hybrid multi-gravity-zone station (0.05-0.15g smelting + 0g refining) fits within 400-500k kg mass envelope

60%

The central station this mass envelope sized is abandoned; processing is co-located at the target NEA. Whether gravity is needed at all is contested: partial-gravity melting is one route (T07, TRL 2-3) alongside no-melt carbonyl refining (T06) and H2 reduction (T17). Each route is judged separately at KDP-0B.

metallurgymicrogravityartificial-gravityarchitecture
2 validations - Updated Oct 20, 2026
Details
bom-0-3 rq-0-11

Project Dyson — A volunteer-led nonprofit. All plans and research are publicly available.