External Organizations

Space agencies, research labs, and industry partners for validating LLM-generated specifications. Track outreach questions and responses.

Overview

15
Organizations
27
Questions

By Status

draft 27

By Priority

critical 10
high 15
medium 2

Filters

Showing 15 organizations
Space Agency

NASA

National Aeronautics and Space Administration

US space agency with extensive ISS solar array data and ISRU research programs.

solar-array-degradationisruspace-power-systems +1
Propulsion Lab

JPL

Jet Propulsion Laboratory

NASA's lead center for robotic exploration with Dawn ion propulsion heritage.

ion-propulsiondeep-space-operationsautonomous-systems +1
Space Agency

ESA

European Space Agency

European space agency with expertise in debris mitigation and precision formation flying.

debris-mitigationformation-flyingspace-environment +1
Propulsion Lab

Busek

Busek Co. Inc.

Commercial Hall thruster manufacturer with alternative propellant expertise.

hall-thrustersalternative-propellantsiodine-propulsion +1
Propulsion Lab

Aerojet

Aerojet Rocketdyne

Major propulsion contractor with high-power Hall thruster development.

hall-thrustershigh-power-epspace-propulsion +1
PV Research

NREL

National Renewable Energy Laboratory

DOE laboratory with perovskite and advanced PV research programs.

perovskite-pvthin-film-solarradiation-hardness +1
University

MIT SSL

MIT Space Systems Laboratory

Academic research lab specializing in swarm coordination and distributed systems.

swarm-coordinationdistributed-systemsautonomous-assembly +1
Standards Body

ITU

International Telecommunication Union

UN agency coordinating global radio spectrum and satellite orbits.

spectrum-allocationorbital-coordinationinterference-management +1
Manufacturing

Creare

Creare LLC

Engineering R&D firm developing reverse turbo-Brayton cryocoolers for NASA. Leading candidate technology for scaling space cryocoolers from milliwatt to hundred-watt class at 20K.

cryocoolerturbo-braytonzero-boiloff +1
Space Agency

JAXA

Japan Aerospace Exploration Agency

Japanese space agency operating Hayabusa2 asteroid sample return mission. Returned samples from C-type asteroid Ryugu provide ground truth for subsurface mechanical properties and composition.

asteroid-miningsample-returnasteroid-characterization +1
Manufacturing

Northrop Grumman

Northrop Grumman Space Systems

Aerospace contractor that built the JWST sunshield — the largest deployable membrane structure in space. Heritage directly applicable to cryogenic depot sunshield architecture.

deployable-structuressunshieldcryogenics +1
Oversight & Regulatory

GAO

U.S. Government Accountability Office

Author of the Technology Readiness Assessment Guide and the Cost Estimating and Assessment Guide; annual assessments of NASA major projects relate technology maturity at PDR to cost and schedule growth.

technology-readiness-assessmentcost-estimatingprogram-oversight
Standards Body

CRIRSCO

Committee for Mineral Reserves International Reporting Standards

Maintains the international template behind JORC, NI 43-101 and related codes for reporting mineral resources by confidence category.

resource-estimationsampling-standards
Oversight & Regulatory

LSA

Luxembourg Space Agency

Agency of the first European state with a law on the exploration and use of space resources, including mission authorisation.

space-resources-lawlicensing
Standards Body

ICEAA

International Cost Estimating and Analysis Association

Professional body for cost estimating and analysis; maintains a body of knowledge used across government and industry.

cost-estimatingrisk-analysis

Project Dyson — A volunteer-led nonprofit. All plans and research are publicly available.