Research Questions

Open engineering questions extracted from multi-model AI consensus documents. These questions represent critical decisions and research needs identified across all project phases.

Questions Overview

180
Total Questions

By Status

open 103
investigating 43
answered 34
deferred 0

By Priority

critical 51
high 89
medium 34
low 6

By Type

Research 16
Experiment 41
Simulation 32
Decision 44
Discussion 27
20

By Phase

Phase 0 87
Phase 1 51
Phase 2 32
Phase 3a 5
Phase 3b 5
Showing 180 questions
Simulation Critical
Investigating

What confidence do the Phase 0 contingency rates buy, and is 0A within the D-01 assumption?

The regenerated bom-0-17 consensus sets contingency at 40–50% for 0A and 55–70% for 0B. It asks for the rates to be "computed, not chosen", with correlation and common-cause drivers modelled. The regenerated BOM puts 0A at $6.3–12.3B before contingency and $8.8–18.4B with it, against D-01 assumpt...

cost-riskcontingencymonte-carlod-01
Simulation High
Open

What fraction of handled regolith escapes the target, by particle size and release speed?

D-03 sets an interim ALARP escape ceiling. The regenerated consensus documents disagree on its value (≤1×10⁻⁴ of handled mass for bom-0-15, GPT's 10⁻⁶ study case, ≤1×10⁻³ for the pathfinder) and share open questions: electrostatic lofting of fresh fines at ~10⁻⁴ g, the target's natural shedding r...

debriscontainmentelectrostaticsd-03
Decision High
Open

Which BOM line owns programme management, systems engineering and mission assurance, and how long is 0A?

All three models exclude programme management, systems engineering and mission assurance (PM/SE/MA) from bom-0-7. No other line claims it, and Claude rates it the largest unowned scope risk. Separately, operations prices 0A at about 4–5.5 years, while the D-02 KDP-0B window puts it at 6–15 (CI-27).

wbsprogramme-managementschedulegovernance
Research High
Open

How do agencies set composite TRLs, scale limits for TRL 6 and the readiness of flown experiments?

The framework-mode deliberations on the WP-A gate rulings (rq-0-65 … rq-0-75) stopped after one round with three positions on several rules that established practice may already settle. The models argued from first principles and partial recollection of NASA, DoD, ESA and GAO guidance; none was g...

gatestrltechnology-readiness-assessmentgovernance
Analysis Critical
Open

Does each split technology have a credible, costed fallback that keeps 0B production viable?

The panel split on whether eight technologies are project-ending or architecture-change (rq-0-65: T02, T10, T14, T15, T22, T24, T25, T26), and on the exceptions for T09, T12 and T20 at KDP-0B (rq-0-66). Claude and GPT agree on the test: a technology is project-ending unless an independently revie...

gatesrisk-classificationfallbackseconomics
Research High
Open

How far have space and process technologies been extrapolated from test to flight or plant, and where did scale-up fail?

rq-0-71 left three positions on how far a TRL 6 test may be extrapolated: a 10× default with a 100× hard limit (Claude), no fixed limit when governing regimes match (Gemini), and a test-supported envelope with no universal ratio (GPT). On duration and wear: numerical runtime rules (Claude), ≤ 10×...

gatestrlscale-upreliability
Simulation Critical
Open

Can ground facilities plus a cluster model take MW-class EP (T01) to TRL 6, and what would a flight subset cost?

rq-0-75 left three test paths for the MW-class SEP cluster: ground modules + cluster model + a small flight anchor of 2–4 modules (Claude), ground modules + model with no flight (Gemini), and ground qualification + a representative flight subset sized by interaction coverage (GPT). They disagree ...

electric-propulsiontrltest-facilitiesgates
Simulation Critical
Open

What sampling and assay evidence bounds a target's bulk grade well enough for the target gate and KDP-0B?

The panel agreed that T11 and T18 must be at TRL 6 at scout PDR, but not on what the target gate and KDP-0B require of T18 (sampling and in-situ bulk-grade assay). Claude and GPT want validated, target-specific sampled-data thresholds, with TRL as supporting evidence. Gemini wants T18 at TRL 7 th...

prospectingsamplingresource-estimationgates
Discussion High
Investigating

Which risk class should apply to the eight technologies the panel split on (T02, T10, T14, T15, T22, T24, T25, T26)?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

Must T11, T18, T09, T12 and T20 be at TRL 6 at KDP-0B?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

May the economics gate pass 0B at a cost above Earth supply (a capability premium R), or does any premium need a separate owner decision?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

Should TRL 6 demonstrations carry a fixed scale-extrapolation limit (e.g. ≤ 10×) or none fixed in advance?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

How should the headline TRL of a composite technology be set: capped by its weakest critical part, or assessed on the integration?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

How should D-02's 'TRL 4–5 for internal 0A milestones' apply to 0A flight projects (scouts, pathfinder)?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Investigating

Which path should take the MW-class SEP cluster (T01) to TRL 6: ground modules plus a cluster model, or a flight subset?

The Phase 0 TRL re-baseline (work package WP-A, `reconciliation/phase-0/trl/`) has produced a gate proposal under owner decision D-02: three programme decisions (KDP-0A, a 0A mid-term review, KDP-0B), four discriminating gates TRL cannot express (target, demand, economics, licence) and pre-commit...

gatestrldecision-frameworks
Discussion High
Answered

What should the TRL rating of deep-space communications and command (T26) assess?

The TRL re-baseline of the revised Phase 0 architecture (rq-0-62, work package WP-A, `reconciliation/phase-0/trl/`) rated 26 critical technologies with a three-model panel (Claude Opus 5.5, Gemini 3.1 Pro, GPT-6.1 Sol). The panel agreed within one TRL level on 24 of them. It diverged most on **T2...

trlcommunicationscommand-securitydecision-frameworks
Experiment Critical
Open

Target asteroid class and recoverable product grade

The re-assessment panel split on what the first target is. Claude: one site cannot give both products; S-type gives native Fe-Ni, C-type gives water plus magnetite. Gemini: a C/M-type chondrite gives 8–12 wt% metal and 5–10 wt% water from the same feed. GPT: a metal-bearing target with ~20% recov...

target-selectioncompositionfe-niwater
Experiment High
Investigating

No-melt Fe-Ni refining routes (carbonyl, H₂ reduction): yield and reagent recycling

The panel split on the metallurgy route. Claude baselines routes needing no gravity (magnetic beneficiation, then carbonyl or H₂ reduction), with centrifugal melting only at pilot scale. Gemini baselines a rotating furnace at 0.05–0.15 g (rq-0-11). GPT: "gas/solid metallurgy is not automatically ...

metallurgycarbonylhydrogen-reductionmicrogravity
Research High
Open

Delivered cost per kg to NEA sites and SEL1

Launch cost is the main cost spread between the models ($3–96B), and much of it is a basis difference: Claude and Gemini price per kg to LEO ($1,200–4,000 today, $300–1,000 Starship-mature), GPT per kg delivered to the operating network ($3,000–12,000), noting LEO prices "do not establish this de...

launchcostmarket
Analysis Critical
Open

Phase 1 material demand for Phase 0 output

No Phase 0 document ties output to Phase 1 need (finding P0-F19). Claude: ISRU-eligible Phase 1 demand is 0.04–11 kt/yr, unknown within 65×. Gemini proposes 1,200 t/yr structural Fe-Ni plus 500 t/yr water to SEL1; GPT 0.6–1.0 kt/yr Fe-Ni and zero Al, Si or water. All three want a signed schedule ...

phase-interfacedemandfe-niphase-1
Simulation High
Open

Phase 0 → Phase 1 delivery node

Claude and Gemini pick SEL1 (Gemini cites a 1.5–2.5 km/s each-way penalty from L4/L5); GPT says auto-relocating to L1 is "too strong" and wants joint optimisation with Phase 1, noting L1 needs station-keeping and traffic management. D-04 uses SEL1 as a reference only.

logisticsorbitsel1phase-interface
Analysis Medium
Open

Lunar electromagnetic launch systems for material export

Electromagnetic launch from the lunar surface is one of the oldest proposed methods for space resource utilization, dating to O'Neill's mass driver concepts in the 1970s. The Moon's low escape velocity (2.4 km/s), negligible atmosphere, and abundant surface materials make it an ideal candidate fo...

Moonmass-driverelectromagnetic-launchmaterial-export +1
Experiment High
Investigating

In-situ semiconductor fabrication feasibility from asteroid feedstock

The mass closure ratio (rq-0-43) is most severely limited by electronics and semiconductor components. Every autonomous system in Project Dyson — mining robots, transport vehicles, manufacturing foundries — requires processors, sensors, and control electronics. Currently, semiconductor fabricatio...

Simulation Low
Open

Reinforcement learning deployment optimizer and 100K+ unit scalability

The RQ-1-43 ML trajectory deployment optimizer uses a trained MLP for delta-V estimation combined with greedy/NN-guided heuristics to sequence swarm unit deployment. The NN has been retrained on the deployment regime (0.9-1.1 AU, val MSE 0.0005) and produces accurate transfer cost estimates, but ...

Simulation Critical
Answered

Thermodynamic cascade efficiency limits in nested Matrioshka shells

The Matrioshka brain architecture relies on a thermodynamic cascade where each nested shell operates at a successively lower temperature, harvesting waste heat from inner layers to power additional computation. The theoretical foundation assumes near-ideal thermophotovoltaic (TPV) energy conversi...

Simulation Critical
Answered

Self-replication closure threshold for autonomous manufacturing foundries

The Matrioshka brain construction timeline depends critically on self-replicating manufacturing foundries that can exponentially expand production capacity. The consensus target is >=96% mass closure—meaning 96% of a foundry's mass can be produced by an identical foundry using only in-situ resour...

Discussion High
Open

Inter-layer latency and consensus protocols for light-hour scale distributed computing

The Matrioshka brain's distributed operating system must coordinate computation across shells spanning from ~0.1 AU (inner hot layer) to potentially 1+ AU (outer cold layers). At these scales, light-speed communication latency becomes a fundamental constraint: round-trip time between inner and ou...

Simulation Critical
Answered

Shkadov mirror standoff distance optimization: 0.1 AU vs 1.0 AU trade study

The Shkadov mirror array uses reflected solar radiation to produce net thrust on the Sun. The mirror elements operate at a "statite" equilibrium point where radiation pressure exactly balances gravitational attraction. The standoff distance—how far from the Sun this equilibrium occurs—is a critic...

Simulation High
Answered

Machine learning trajectory optimization for swarm deployment sequencing

The Global Trajectory Optimization Competition 11 (GTOC 11) challenged teams to design optimal deployment strategies for a Dyson ring of collector stations around the Sun. The winning solutions (documented in arxiv 2205.10124) demonstrated that machine learning approaches, particularly neural net...

Decision Critical
Open

Orbital capture architecture definition

Mass drivers represent the primary bulk material transport infrastructure for Phase 1 Dyson swarm deployment, designed to launch payloads at 2.4-3.5 km/s from lunar or Mercurian surfaces toward orbital aggregation points. The consensus document specifies coilgun architecture capable of launching ...

capture-systemmass-driverrendezvous
Experiment High
Open

Foundation and recoil management for mass drivers

Mass drivers for Project Dyson's Phase 1 deployment utilize linear synchronous motor (coilgun) architecture to launch payloads at 2.4-2.6 km/s muzzle velocity. The consensus specifications call for 100-1,000 g average acceleration (1,000-10,000 m/s²), with track lengths ranging from 650 m to 3,40...

foundationgeotechnicalrecoillunar-surface
Decision Medium
Open

Carrier/sabot reuse logistics

Mass drivers for Project Dyson's Phase 1 deployment will launch payloads at velocities of 2.4–3.5 km/s using linear synchronous motor (coilgun) architecture. Each payload requires a carrier or sabot—a structural interface that couples the payload to the electromagnetic acceleration system, contai...

Decision High
Open

Refueling concept of operations

Orbital Tugs represent the primary logistics backbone for Phase 1 Initial Swarm Deployment, responsible for transporting 2,000–8,000 kg payloads across cislunar and heliocentric space. These 50 kW-class Solar Electric Propulsion vehicles are designed for 7–15 year operational lifetimes with thrus...

Simulation Critical
Answered

Standard depot orbit selection

Orbital tugs represent the primary logistics backbone for Phase 1 Initial Swarm Deployment, responsible for transporting 2,000–8,000 kg payloads between manufacturing nodes, depots, and assembly yards. The consensus document specifies a depot-based operational architecture from day one, with prop...