Zero boil-off cryogenic LH2/LOX storage at L4/L5 requires less than 1% of station power budget

cryogeniczero-boil-offpropellantthermal
Original Source

rq-0-30 Deliberation Conclusion

Validation History

85% confidence Oct 20, 2026

Phase 0 re-assessment, round 2 (reconciliation/phase-0/round-2/reconciliation/phase.md §2)

All three models agree there is no production LOX/LH2 in Phase 0; the cryogenic depot is removed from Phase 0 and deferred to Phase 1. The thermal result is unchanged, but its premise (a Phase 0 depot at L4/L5) no longer holds.

By: Phase 0 Re-assessment Panel Marked outdated for Phase 0; reusable when cryogens return in Phase 1.
85% confidence Mar 19, 2026

Multi-model deliberation rq-0-30 (unanimous, 1 round). Plachta ZBO series, Notardonato 125kL LH2 demo, ULA ACES depot concept

Sunshield reduces 204kW solar input to 40-135W. Two-stage active cooling at 10-20kW achieves ZBO for full tank farm. Less than 1% of 2.5-3.25MW station power.

By: Multi-Model Deliberation Backed by NASA GRC ZBO test data