Outdated Last updated: October 20, 2026
Hybrid multi-gravity-zone station (0.05-0.15g smelting + 0g refining) fits within 400-500k kg mass envelope
metallurgymicrogravityartificial-gravityarchitecture
Original Source
rq-0-11 Deliberation Conclusion
Validation History
60% confidence Oct 20, 2026
Phase 0 re-assessment, round 2 (§2, §3.9) and TRL re-baseline (T05-T07, T17, T23)
The central station this mass envelope sized is abandoned; processing is co-located at the target NEA. Whether gravity is needed at all is contested: partial-gravity melting is one route (T07, TRL 2-3) alongside no-melt carbonyl refining (T06) and H2 reduction (T17). Each route is judged separately at KDP-0B.
By: Phase 0 Re-assessment Panel Marked outdated: the station premise no longer holds.
65% confidence Mar 19, 2026
Multi-model deliberation rq-0-11 (unanimous, 2 rounds). Ratke & Diefenbach review, ISS EML data, D'Angelo AM
Pure microgravity smelting not viable at industrial scale. Rotating arm (~50m, 1.4 RPM) provides 0.1g for smelting. Mass 340-430k kg. Reduces risk from TRL 2-3 to TRL 3-4.
By: Multi-Model Deliberation Gravity thresholds based on dimensional analysis only. Needs 0.01-0.2g experiment data.
Details
- Related BOM Item
- bom-0-3
- Related Question
- rq-0-11
- Claim ID
- val-010
- Validations
- 2