Publications
Manuscripts from the Project Dyson research program, with target venue, review status, and citable DOI once minted. Manuscript sources are maintained in the dyson-research repository.
| # | Title | Venue | Status | DOI |
|---|---|---|---|---|
| 01 | Economic Inflection Points in Space Manufacturing: Monte Carlo Analysis of In-Situ Resource Utilization vs. Earth Launch for Large-Scale Space Infrastructure | Advances in Space Research | Draft | pending |
| 02 | Design Equations and Parametric Sizing for Hierarchical Coordination in Large Autonomous Space Swarms | TBD (IEEE format) | Draft | pending |
| 03 | Multi-Model AI Deliberation for Complex Engineering Decisions: A Structured Methodology with Divergent View Preservation | Systems Engineering (INCOSE) / IEEE Intelligent Systems (backup) | Draft | pending |
| 04 | Microgravity Metallurgy at Industrial Scale: Scaling Laws, Architecture Trade-offs, and Technology Maturation Pathways for In-Space Metal Processing | Acta Astronautica | Draft | pending |
| 05 | ISRU Water Extraction for Space Propellant: Monte Carlo Comparison of Asteroid and Lunar Sources at Industrial Scale | Advances in Space Research | Draft | pending |
| 06 | Cryogenic Propellant Architecture | TBD | Scaffold | pending |
| 07 | Collision Avoidance Certification | TBD | Scaffold | pending |
| 08 | Space Solar Power Economics | TBD | Scaffold | pending |
| 09 | Multi-Century Governance | TBD | Scaffold | pending |
| 10 | In-Space Thin-Film Deposition | TBD | Scaffold | pending |
| 11 | High-Voltage Architecture & Arc Management | TBD | Scaffold | pending |