Investigating

Integrated schedule for Phase 0A, the gates and the 0B ramp

Analysis High
schedulegatesplanning

Background

No panel model produced an integrated schedule; only fragments (Claude: 3–6 yr delay; GPT: deliveries ~3 yr after 0B authorisation). Several critiques cite schedule as a decision criterion, and CI-18 found the existing gates scheduled before their technologies are ready.

Raised by the Phase 0 re-assessment (round 2, 2026-10-12): reconciliation/phase-0/round-2/reconciliation/phase.md and reconciliation/phase-0/decisions.md.

Why This Matters

Gates must be timed to technology readiness, and D-01 accepts a delay whose size is unknown.

How this gets answered

  • Analysis — Critical-path schedule from the TRL re-baseline (rq-0-62), test campaigns and launch windows, with cost of delay per gate.

Research Directions

  1. Earliest KDP-0B date by technology.
  2. Cost of delay per month.

Question Details

Question ID
rq-0-63
Created
2026-10-12
Related BOM Items
bom-0-7bom-0-3bom-0-4