Power Systems Architecture
Power distribution, interfaces, and system design
21 linked artifacts · Maps 11 tags
Linked Artifacts
Research Questions (14)
In-situ semiconductor fabrication feasibility from asteroid feedstock P0Cryocooler scaling from milliwatt to hundred-watt class for space ZBO P0High-voltage power tethers on abrasive regolith: insulation life P0How do the target's spin state and pole set site power storage and Earth visibility? P0High-voltage arc fault behavior in plasma environment P1High-voltage arcing prevention on ultra-thin substrates P1Swarm-level power architecture and end-use P1Nuclear vs solar power decision for Assembly Node P1In-situ conductor production feasibility P1Optimal superconducting coil operating temperature P1Radiation hardening balance vs mission risk and cost P1Multi-kilovolt arc management in kilometer-scale membranes P2Power export interface standard P2Swarm operational threshold for meeting humanity's energy needs P2
BOM Items (4)
Mapped Tags
power-architecturepower-deliverypower-interfacepower-sourcepowerpower-systemshigh-voltageconductorelectronicssuperconductorelectromagnetic