Open

How do the target's spin state and pole set site power storage and Earth visibility?

Simulation High
powerilluminationcommunicationstarget-selection

Background

The regenerated bom-0-5 and bom-0-9 consensus both make the target's spin state a target-gate criterion. They do not say what values pass: storage moves from about 1 to over 2.5 MWh with plant hold loads, and a fast rotator may need terminals 180° apart and slew rates of ≥5°/min.

Why This Matters

Turns two open questions into thresholds the remote survey and scouts can check before a target is chosen.

How this gets answered

  • Simulation: Illumination and Earth-visibility time series for synthetic bodies over spin period, pole orientation and orbit (the rq-0-52 shortlist). Pad shadowing from shape models where they exist. Storage sized for cold shutdown and hold loads with one string out (GPT's method), and link availability for two terminal placements.

Research Directions

  1. Storage MWh and array oversizing against spin period and pole for each illumination class.
  2. Earth-visibility fraction and conjunction outages for the shortlist.
  3. Pass or fail thresholds for the target gate.

Question Details

Question ID
rq-0-86
Created
2026-10-25
Related BOM Items
bom-0-5bom-0-9bom-0-3