Open
High-voltage power tethers on abrasive regolith: insulation life
Experiment Medium
powertetherdustinsulation
Background
All three models move robot power to a 1–3 kV tether from site power. Gemini alone raises insulation life on abrasive, electrostatically charged regolith.
Raised by the Phase 0 re-assessment (round 2, 2026-10-12): reconciliation/phase-0/round-2/reconciliation/phase.md and reconciliation/phase-0/decisions.md.
Why This Matters
The tethered-robot architecture depends on it; failure modes are arcing and abrasion.
How this gets answered
- Experiment — Abrasion and vacuum-arc testing of candidate tether insulation with regolith simulant, thermal cycling and charging.
- Literature research — Lunar dust and HV cable literature (Apollo, Artemis surface power).
Research Directions
- Insulation wear rate and arc thresholds.
- Tether management in microgravity.
Question Details
- Source Phase
- Phase 0 - Resource Acquisition
- Source BOM Item
- Mining Robots
- Question ID
- rq-0-60
- Created
- 2026-10-12
- Related BOM Items
- bom-0-2bom-0-5
Related Questions
Regolith behavior during microgravity excavation
critical - investigating
Anchoring technology reliability across asteroid types
critical - investigating
Optimal fleet composition: homogeneous vs specialized
high - open
Electrostatic charging effects on mechanisms
high - investigating
On-board processing cost-effectiveness vs bulk transport
medium - open