Degradation & Longevity
Material degradation, UV exposure, and lifetime management
17 linked artifacts · Maps 7 tags
Linked Artifacts
Research Questions (10)
Energy storage technology for 30-year station life P0Radiation degradation rate at L4/L5 location P0MLI long-duration performance and degradation at L4/L5 P0Thin-film PV radiation degradation rates at 0.3-0.5 AU P1End-of-life disposal protocol for orbital tugs P1Optical surface degradation from micrometeoroids P1End-of-life disposal for failed swarm nodes P1Thin-film substrate long-term UV degradation P2Cold-welding and mechanism degradation P2Radiator durability and contamination over decades P2
Blog Posts (4)
Mapped Tags
degradationoptical-degradationUV-degradationlongevitylifetimeend-of-lifedisposal