Aerojet
Aerojet Rocketdyne
Major propulsion contractor with high-power Hall thruster development.
Outreach Questions (2)
What is the current AEPS thruster lifetime and qualification status, and what performance and wear data exist for Hall thrusters and clusters at 100–250 kW per module?
Project Dyson's revised Phase 0 cargo tugs need 1–2.5 MWe of electric propulsion, built from 100–250 kW modules; our model panel rates this TRL 2–4 against TRL 6 at the production decision. AEPS at 12.5 kW is the nearest system in qualification. The scaling path from 12.5 kW modules to MW-class clusters, and what ground tests can show, drives the test plan (rq-0-79).
From AEPS and higher-power Hall work, how well did single-thruster ground tests predict flight performance and life, and what facility effects had to be corrected?
Project Dyson is setting a rule for how far TRL 6 tests may be extrapolated, and choosing a test path for a MW-class EP cluster.
Question Status
Contacts
Electric Propulsion Division
High-Power EP Development
AEPS program for 13+ kW Hall thrusters