Space Agency

NASA

National Aeronautics and Space Administration

Website

US space agency with extensive ISS solar array data and ISRU research programs.

solar-array-degradationisruspace-power-systemsdebris-mitigation

Outreach Questions (6)

oq-1-1
Draft

What is the measured degradation rate of ISS solar arrays after 20+ years of LEO operation?

Project Dyson collector units require 30-year lifespans. ISS data provides the longest baseline for thin-film and multi-junction PV degradation in the space environment.

Related: rq-1-1, rq-0-25
Created: 2026-02-05
oq-1-2
Draft

What ISRU technology readiness levels have been achieved for oxygen and metal extraction from regolith?

Phase 2 manufacturing expansion relies on in-situ resource utilization. NASA's ISRU programs provide the most advanced TRL data.

Related: rq-1-12, rq-1-21
Created: 2026-02-05
oq-1-3
Draft

What were the key results and lessons learned from the GODU-LH2 zero-boiloff ground demonstration at Kennedy Space Center?

GODU-LH2 demonstrated 390W of cooling at 20K using a Linde LR1620 industrial refrigerator, proving ZBO physics at the scale Project Dyson requires. Data on system efficiency, thermal cycling, and long-duration performance is critical for our cryogenic propellant architecture decision gate.

Related: rq-0-30, rq-0-49
Created: 2026-02-13
oq-1-4
Draft

What ISS microgravity metallurgy experiments have been conducted, and what sample quality and scale has been achieved?

Microgravity metallurgy at industrial scale is rated TRL 2-3 and carries project-ending risk for Project Dyson. Any ISS metal melting, solidification, or containerless processing data is critical for our materials processing viability decision gate.

Related: rq-0-11, rq-0-12
Created: 2026-02-13
oq-1-5
Draft

In NASA technology readiness assessments, how is the TRL of a composite technology set (capped by its weakest critical element, or assessed on the integration), and what scale or fidelity must a test article have to count as a TRL 6 representative model?

Project Dyson's gate rules need TRL 6 with no waiver for project-ending technologies at a one-way gate. Our model panel split on composite ratings and on whether a fixed scale-extrapolation limit should apply. We want to follow NASA practice where it is explicit.

Related: rq-0-76, rq-0-72, rq-0-71
Created: 2026-10-20
oq-1-6
Draft

Which NASA vacuum facilities can test high-power electric propulsion at representative background pressure, and what flow and power limits apply per propellant (xenon, krypton, argon, iodine)?

A MW-class SEP cluster must reach TRL 6 before Project Dyson's KDP-0B. Whether ground modules plus a cluster model can do this, or a flight subset is needed, turns on facility pumping limits.

Related: rq-0-79, rq-0-75, rq-0-54
Created: 2026-10-20

Question Status

draft 6

Contacts

ISS Power Systems Office

Technical Contact

Johnson Space Center

Primary contact for ISS solar array performance data