Technology readiness re-baseline for the revised Phase 0 architecture
Analysis Critical
trlad2gatesreadiness
Background
The TRL table (src/lib/services/trl-assessment.ts) covers 6 of 33 BOM items (CI-19) and describes the original architecture. It rates "high-power SEP (100+ kW)" at TRL 6–7, while the revised design needs 1–2.5 MWe tugs the panel rates at TRL 2–4. The round-2 gates used no TRL at all because the re-assessment prompts did not include the table.
Raised by the Phase 0 re-assessment (round 2, 2026-10-12): reconciliation/phase-0/round-2/reconciliation/phase.md and reconciliation/phase-0/decisions.md.
Why This Matters
D-02 puts a TRL target and an AD² rating on every critical technology at KDP-0B. That needs a current, scale-specific baseline.
How this gets answered
- Analysis — Technology readiness assessment per NASA NPR 7123.1 / ECSS-E-HB-11A for each critical technology at the revised scale and environment, with AD² (advancement degree of difficulty).
- Literature research — Heritage evidence per technology.
Research Directions
- List critical technologies of the revised architecture.
- TRL and AD² each, with evidence.
- Feed gate thresholds and the schedule (rq-0-63).
Question Details
- Source Phase
- Phase 0 - Resource Acquisition
- Source BOM Item
- Material Processing Station
- Question ID
- rq-0-62
- Created
- 2026-10-12
- Related BOM Items
- bom-0-1bom-0-2bom-0-3bom-0-4bom-0-5bom-0-6
Related Questions
Scaling microgravity metallurgy to industrial production
critical - investigating
Optimal zone refining process in zero-g
high - investigating
Slag management and recycling in microgravity
medium - investigating
Propellant production in Phase 0 scope
medium - answered
Achievable silicon purity for solar cells
critical - investigating