What fraction of handled regolith escapes the target, by particle size and release speed?

Simulation High
debriscontainmentelectrostaticsd-03

Background

D-03 sets an interim ALARP escape ceiling. The regenerated consensus documents disagree on its value (≤1×10⁻⁴ of handled mass for bom-0-15, GPT's 10⁻⁶ study case, ≤1×10⁻³ for the pathfinder) and share open questions: electrostatic lofting of fresh fines at ~10⁻⁴ g, the target's natural shedding rate, and the fraction of lofted mass that reaches arrays (η).

Why This Matters

The ceiling sizes containment hardware in three BOM lines and is a licence-gate criterion.

How this gets answered

  • Simulation: Ballistic Monte Carlo on a rotating, irregular body (gravity, centrifugal, solar radiation pressure, a photoelectron-sheath charging model) for released particles by size bin and release speed relative to local escape. Output: escape and re-impact fractions, interception by site assets, and their sensitivity to spin period and body size.
  • Literature: Bennu particle-ejection events, Apollo and lab electrostatic lofting, Hayabusa2 SCI and OSIRIS-REx TAG ejecta.

Research Directions

  1. Escape fraction against release speed and size, for two or three body classes.
  2. Which particle sizes dominate escape at a given placement-speed limit (bom-0-2 uses ≤0.25–0.3 v_esc).
  3. A defensible interim ceiling, and what the pathfinder must measure to replace it.

Question Details

Question ID
rq-0-85
Created
2026-10-25
Related BOM Items
bom-0-15bom-0-2bom-0-3bom-0-12