Open
MW-class electric propulsion: life, thermal load and plume compatibility
Experiment Critical
electric-propulsionqualificationthermaliodine
Background
The revised architecture relies on 1–2.5 MWe tugs. The panel rates high-power iodine at TRL 2–4 (the TRL table still says 6–7 for "100+ kW SEP"). Life requirements differ: Claude ≥10,000 h; Gemini 5,000 h at ≥100 kWe; GPT total-impulse qualification for the actual 20,000–40,000 h duty. How much of the thrusters' ~0.8 MW of losses the spacecraft must reject is open (Claude: PPU losses only; GPT: must be measured). Gemini raises iodine plume corrosion of arrays.
Raised by the Phase 0 re-assessment (round 2, 2026-10-12): reconciliation/phase-0/round-2/reconciliation/phase.md and reconciliation/phase-0/decisions.md.
Why This Matters
Tug life and thermal design are project-ending for the transport chain, and set the propellant choice (D-05).
How this gets answered
- Experiment — Life and wear testing of a MW-class cluster (or 100–250 kW modules toward it); thermal-vacuum measurement of heat conducted into the spacecraft; plume deposition on array coupons.
- Literature research — Existing high-power Hall/MPD/VASIMR test data.
Research Directions
- Total-impulse qualification plan for the real duty cycle.
- Thermal load fraction to the bus.
- Plume compatibility per propellant.
Question Details
- Source Phase
- Phase 0 - Resource Acquisition
- Source BOM Item
- Transport Vehicles
- Question ID
- rq-0-54
- Created
- 2026-10-12
- Related BOM Items
- bom-0-4bom-0-5