Beneficiation ratio for native Fe-Ni in microgravity

Experiment Critical
beneficiationmagnetic-separationmass-flow

Background

Every closed mass-flow chain from the panel concentrates at the site before shipping: Claude 5–15:1, Gemini ~5–8:1, GPT 4:1 (25% yield). None is backed by data at representative feed in microgravity. Claude names a falsifier: a ratio below 3:1 breaks co-located processing.

Raised by the Phase 0 re-assessment (round 2, 2026-10-12): reconciliation/phase-0/round-2/reconciliation/phase.md and reconciliation/phase-0/decisions.md.

Why This Matters

The concentration ratio sets robot count, site power and the product per tonne excavated. Co-location (agreed by all three models) depends on it.

How this gets answered

  • Experiment — Magnetic and size separation of representative regolith simulant at reduced gravity (parabolic flight, drop tower, then the 0A pathfinder).
  • Simulation — DEM of grain transport in the separator to bound throughput.

Research Directions

  1. Build a simulant with realistic metal grain size and attachment (metal bonded in clay matrices is Gemini's falsifier).
  2. Measure yield and grade against throughput.
  3. Feed the result into rq-0-61.

Question Details

Source BOM Item
Mining Robots
Question ID
rq-0-51
Created
2026-10-12
Related BOM Items
bom-0-2bom-0-3