Engineering the Largest Structure Ever Conceived

One research question at a time.

What if we could capture the
full energy output of a star?

A Dyson swarm is a constellation of solar-collecting satellites orbiting a star. It's the difference between catching rain in a cup and damming an entire river.

Earth's total energy use 580 exajoules/year
A Dyson swarm 3.8 × 10²⁶ watts

Earth's energy consumption is not even visible at this scale.

5 phases. Centuries.
$9.59T.

Phase 0 is split in two. Phase 0A—research, rendezvous scouts and a pathfinder—proves what can be done. Phase 0B, production at an asteroid, is an option we exercise only at a gate, once the technology, a target, demand, cost and a licence all check out.

0

Space Resource Processing In Progress

0A $8.8B–$18B · with 0B $32B–$100B 10-15 years

Find out whether asteroid material can supply the swarm. Phase 0A funds the research, rendezvous scouts and a pathfinder; Phase 0B, iron-nickel production at the target asteroid, is held as an option and committed only at KDP-0B (decision D-01).

1

Initial Swarm Deployment Planned

$158.00B 20-30 years

Begin construction of the first Dyson swarm elements. This phase focuses on building and deploying initial solar collector satellites, establishing assembly infrastructure, and creating the communication/control systems.

2

Swarm Expansion Planned

$375.00B 50-100 years

Scale up satellite production and deployment to achieve grid-significant power delivery (~1 TW to Earth). CAPACITY COST MODEL: Self-replicating ISRU foundries produce 100,000 units; cost represents seed investment, bootstrap operations, and "vitamin" imports rather than unit-count multiplication.

3

Matrioshka Brain Planned

$7.50T 200-1000 years

Transform the Dyson swarm into a nested megastructure of computational shells. CAPACITY COST MODEL: ~1,350x reduction from linear methodology reflects self-replicating ISRU economics. Cost represents seed investment, R&D, "vitamin" imports, and governance software.

3

Stellar Engine Planned

$1.50T 200-500 years

Construct stellar propulsion systems to enable controlled movement of the Sun and Solar System. CAPACITY COST MODEL: ~73x reduction from linear methodology reflects ISRU economics and shared Phase 2/3a infrastructure. Cost represents R&D, seed deployment, and "vitamin" imports.

51
Questions
5
Resolved
150+
Papers Cited
23
Contributors
7
Tech Threads

23 volunteers. Zero investors.
Everything is public.

Every plan is open. Every paper is cited. Every decision is documented. We need researchers, engineers, writers, and developers.

Research Contributor Engineering Analyst Content Creator Developer

Project Dyson — A volunteer-led nonprofit. All plans and research are publicly available.