Engineering the Largest Structure Ever Conceived
One research question at a time.
What if we could capture the
full energy output of a star?
A Dyson swarm is a constellation of solar-collecting satellites orbiting a star. It's the difference between catching rain in a cup and damming an entire river.
Earth's energy consumption is not even visible at this scale.
5 phases. Centuries.
$9.59T.
Phase 0 is split in two. Phase 0A—research, rendezvous scouts and a pathfinder—proves what can be done. Phase 0B, production at an asteroid, is an option we exercise only at a gate, once the technology, a target, demand, cost and a licence all check out.
Space Resource Processing In Progress
Find out whether asteroid material can supply the swarm. Phase 0A funds the research, rendezvous scouts and a pathfinder; Phase 0B, iron-nickel production at the target asteroid, is held as an option and committed only at KDP-0B (decision D-01).
Initial Swarm Deployment Planned
Begin construction of the first Dyson swarm elements. This phase focuses on building and deploying initial solar collector satellites, establishing assembly infrastructure, and creating the communication/control systems.
Swarm Expansion Planned
Scale up satellite production and deployment to achieve grid-significant power delivery (~1 TW to Earth). CAPACITY COST MODEL: Self-replicating ISRU foundries produce 100,000 units; cost represents seed investment, bootstrap operations, and "vitamin" imports rather than unit-count multiplication.
Matrioshka Brain Planned
Transform the Dyson swarm into a nested megastructure of computational shells. CAPACITY COST MODEL: ~1,350x reduction from linear methodology reflects self-replicating ISRU economics. Cost represents seed investment, R&D, "vitamin" imports, and governance software.
Stellar Engine Planned
Construct stellar propulsion systems to enable controlled movement of the Sun and Solar System. CAPACITY COST MODEL: ~73x reduction from linear methodology reflects ISRU economics and shared Phase 2/3a infrastructure. Cost represents R&D, seed deployment, and "vitamin" imports.
before spending a single dollar.
The New Phase 0 Plan, in 3D
The 3D explorer now shows the re-baselined Phase 0: research and pathfinders first, a gated production option, a plant at the asteroid and a receiving node at Sun–Earth L1. Here is what changed and where to look. · 3 weeks ago
Phase 0, Re-costed: The New BOM and What the Asteroid Catalogue Says
Three models re-specified all 17 Phase 0 items. Then we tested the plan against the real near-Earth asteroid catalogue and against cost history. The trajectories are tighter than planned, propellant is about double, and at the planned scale asteroid metal costs about five times shipping from Earth. · 3 weeks ago
Phase 0 Technology Readiness, Re-baselined
Three models re-rated every critical Phase 0 technology at the scale the revised plan actually needs. Readiness is TRL 2 to 5, seventeen technologies are project-ending, and the five old gates are replaced by a gated option: fund the research, decide production later. · Oct 20, 2026
23 volunteers. Zero investors.
Everything is public.
Every plan is open. Every paper is cited. Every decision is documented. We need researchers, engineers, writers, and developers.